VOLTIVO POWER | POWER ADAPTER BUYING CHECKLIST Revision: 2026-10-06 | https://voltivopower.com/ Use [x] when confirmed, [ ] when open, and N/A where not applicable. Assign an owner and a due date to every unresolved item. This checklist supports purchasing preparation; it does not certify a product or replace the selected model's datasheet and engineering review. 1. DEFINE THE LOAD [ ] Device input voltage and tolerance are documented. [ ] Continuous current and startup/peak demand are documented. [ ] Operating pattern and evaluation conditions are defined. [ ] USB-C output profiles or other product-specific requirements are listed. 2. CONFIRM THE COMPLETE CONNECTION [ ] AC plug/inlet and included mains cord are specified. [ ] DC connector dimensions, polarity and pin assignment are confirmed. [ ] Cable length, strain relief and routing suit the equipment. [ ] The sample includes the cable/accessories intended for the order. 3. REVIEW INSTALLATION [ ] Available space, mounting, airflow and temperature are recorded. [ ] The model's operating limits and any derating have been reviewed. [ ] The engineering team has defined relevant protection requirements. 4. REQUEST MODEL-SPECIFIC DOCUMENTATION [ ] Destination countries and required documents are identified. [ ] Documents match the proposed model and ordered configuration. [ ] A responsible reviewer has assessed the documentation. [ ] Unverified certification claims remain open, rather than assumed. 5. COMPARE QUOTATIONS ON THE SAME BASIS [ ] Each quote uses the same brief revision and quantity. [ ] Included cables, accessories, labels and packaging are clear. [ ] Sample, tooling/development and production charges are separated. [ ] Currency, delivery basis, lead time and quote validity are clear. [ ] Payment terms, inspection expectations and warranty are confirmed. [ ] Proposed alternatives and deviations are recorded. 6. APPROVE BEFORE A BULK ORDER [ ] Engineering has defined and completed the relevant sample evaluation. [ ] The sample's model/revision and evaluation setup are recorded. [ ] Final specification, label, packaging and accessories are approved. [ ] Outstanding questions and sample differences are resolved. [ ] Supplier and buyer have agreed how future changes will be reviewed. PROJECT RECORD Project / brief revision: Model / configuration under review: Procurement owner: Engineering reviewer: Open items and target dates: Approval record and date: Need help preparing your brief? Guide: https://voltivopower.com/resources/how-to-choose-ac-dc-power-adapter/ RFQ: https://voltivopower.com/contact/ Email: babfff@gmail.com